Fujian Integrated Circuit Industry Zone (Science Zone)

Planned Area: a total area of 404 hectares (6060 mu), in which 236 hectares (3540 mu) for industry, 15.5 hectares (233 mu) for commercial use, 25.6 hectares (384 mu) for residence, 76.4 hectares(1146 mu) for traffic facilities, 43.8 hectares(657 mu) for green space and plaza.

Planning Goals: the zone takes the production line of integrated circuit industry as the core, to vigorously introduce leading projects of circuit producing, design, encapsulation testing, and research service platform, thus to create a new city of science and technology gathering production, research and development, innovation, trade, and living.

Accessibility: the industry zone is immediately adjoining to the entrance and exit of the orbital highway, is 3 kilometers away from Jinjiang International Airport, 13 kilometers from Jinjiang Bullet Train Railway Station, 5 kilometers away from Jinjiang Highspeed Railway Station (under construction), 25 kilometers from the Weitou Marina, 14 kilometers from Jinjiang International Land Port, 30 kilometers from Xiamen Dadeng Airport (under construction), and 55 kilometers from Xiamen Gaoqi Airport.

Fujian Integrated Circuit Industry Zone (Industry Zone)

Planned Area: a total area of 746.7 hectares(11200 mu), with the functional structure of "one core four clusters": the ecology landscape spot is 153.3 hectares(2300 mu) as the core, and integrated circuit industry zone from east to west is 366.7 hectares(5500 mu), commerce and comprehensive zone in north is 180 hectares(2700 mu), and resort zone in south is 46.7 hectares(700 mu).

Planning Goals: the zone primarily develops equipment manufacturing for integrated circuit production, encapsulation testing, detecting, silicon semiconductor, photoresist and relevant materials, as well as smart wearable products with functions of living and vacation.

Accessibility: the industry zone is immediately adjoining to the entrance and exit of the orbital highway, is 18 kilometers away from Jinjiang International Airport, 15 kilometers from Jinjiang Bullet Train Station, 10 kilometers from Jinjiang Highspeed Railway Station (under construction), 22 kilometers from the Weitou Marina, 15 kilometers from Jinjiang International Land Port, 12 kilometers from Xiamen Dadeng Airport (under construction), and 45 kilometers from Xiamen Gaoqi Airport. It is separated from Jinmen Island by the sea, and directly connects to Xiamen through a bridge over the sea.

Jinjiang Innovation and Startup Zone (Design Zone)

With an investment of 15 billion yuan, McKinsey & Company is entrusted to plan for the zone and make efforts to build a "Smart Valley" on the west coast. The zone has now introduced Chinese Academy of Sciences, Chinese Academy of Textile Engineering, Institution of the Graphene Industrial Technology and totally 8 public institutions as well as many enterprises to operate in the zone. As for talents, 400 professions of various kinds are introduced, one from national "One Thousand Talents Plan", one from national "Youthful One Thousand Talents Plan", three from provincial "One Hundred Talents Plan". Furthermore, 158 patents are obtained by enterprises.

Planned Area: a total area of 240 hectares (3600 mu), to be constructed in three stages.

Planning Goals: the zone concentrates on the design of integrated circuit, introduces design enterprises at home and broad, and establishes relevant design service platforms, research platforms and institutions as well as innovative incubators.

Quanzhou Comprehensive Bonded Zone

Functions concerning bonded zone, export processing zone, logistic zone and certain customs are combined all on the zone, making it a special customs regulating area that is the most open, comprehensive, convenient, accessible and enjoying the most favorable policies. The zone now provides services including the storage of imported and exported goods, overseas trade, international purchasing, distribution and delivering, international forwarding, examination and test of products, after-sale service, commodity display, R&D and manufacturing, and other businesses approved by the Customs

Planning Area: an area of 205 hectares(3075 mu).

Planning Goals: the zone concentrates on the function of bonded area, and promotes the development of bonded warehouse, equipment leasing, bonded research, and bonded processing of integrated circuit industry.